We implement multi-million investment projects in Poland and abroad (e.g. in Denmark, Ireland, and Lithuania). Our tasks include, among other, designing, construction and modernisation of both 110kV and highest voltage lines, modernisation and installation of new OPGW wires, as well as refurbishment of transmission lines and construction of distribution networks.

We offer comprehensive implementations of power investments, from designing and preparation phase of  a project, through the purchase of materials, construction-assembly work, to the commissioning and tests as well as maintenance and repair works.

Construction of the overhead-cable 110kV GPZ Wanda – PT Podłęże line

The construction of a new 110kV cable-overhead line GPZ Wanda – PT Podłęże was completed at the turn of 2015/2016. Due to field and location hindrances, the line was designed as both overhead and cable line, where swapping of cables and lines took place several times.

Tests of EN422:10 poles, types P and M3, on testing grounds for the two-way overhead 400kV line

ENPROM, as the only Polish company, has designed a new series of 400kV poles, EN422:10, which comply with applicable standards. Prototype poles of P and M3 type passed tests on testing grounds and will be used for the construction of two 400kV lines, Mikułowa – Czarna and Piła Krzewina – Plewiska.