Projects
Construction of the overhead-cable 110kV GPZ Wanda – PT Podłęże line
The construction of a new 110kV cable-overhead line GPZ Wanda – PT Podłęże was completed at the turn of 2015/2016. Due to field and location hindrances, the line was designed as both overhead and cable line, where swapping of cables and lines took place several times.