Construction of the overhead-cable 110kV GPZ Wanda – PT Podłęże line - Enprom

Projects

Construction of the overhead-cable 110kV GPZ Wanda – PT Podłęże line

The construction of a new 110kV cable-overhead line GPZ Wanda – PT Podłęże was completed at the turn of 2015/2016. Due to field and location hindrances, the line was designed as both overhead and cable line, where swapping of cables and lines took place several times.

Overhead and cable lines
Power substations
Design work
Renewable Energy Sources
Drone services
Career
Career
Construction of the overhead-cable 110kV GPZ Wanda – PT Podłęże line